Thursday, September 14, 2017

India's first bullet train project: 350 km/hr top speed, 7 km tunnel under sea, Rs 1.08 lakh crore cost

The high-speed bullet train in India is expected to bring a paradigm shift in how the world views transport system in India. The bullet trains, besides running at unbelievable speeds, are also known for their punctuality and safety features.








Prime Minister Narendra Modi along with Japanese Prime Minister Shinzo Abe today laid the foundation stone for the much-hyped Ahmedabad-Mumbai high-speed bullet train project.
"If technology is used to empower the poor, we can win the fight against poverty," said Narendra Modi.
The Prime Minister and Shinzo Abe inspected a model of the project as well before taking to the dais to inaugurate the billion dollar bullet train project.
Newly appointed Railways Minister Piyush Goyal pitched bullet train as the train for the future and said that "many people criticised the introduction of Rajdhani but now it is the train everyone wants to travel in".
"With laying foundation of the bullet train, we are also laying foundation of a New India," said Maharashtra Chief Minister Devendra Fadnavis at the inauguration ceremony in Ahmedabad.
HERE IS ALL YOU NEED TO KNOW ABOUT THE HIGH-SPEED BULLET TRAIN PROJECT:
HOW MUCH DOES THE BULLET TRAIN PROJECT COST?
The ambitious Ahmedabad-Mumbai high-speed bullet train project will cost an estimated Rs 1.08 lakh crore or USD 17 billion. The project is expected to be completed by 2022.
WHAT WILL BE THE TICKET FARE FOR BULLET TRAIN?
According to Railway officials, the bullet trains would have two categories of seats, executive and economy, and the ticket fares will be comparable to that of AC-2 tier fare for Rajdhani Express.

with thanks : Yahoo News : LINK : for more details

No comments:

Post a Comment